Inspection chamber for green roofs

Inspection chamber for green roofs

TWZN H
Description:

Basic set of four slats for an increase of 4", fasteners are included.

CONTACT US
Bez manžety

Product variants

TYPe
Dimension
Drawing documentation
TWZN H4" 16"/16"
-
TWZN H4" 16"/16"
-
Bez manžety

Product variants

TYPe
Dimension
Drawing documentation
TWZN H4" 16"/16"
-
TWZN H4" 16"/16"
-
Bez manžety

Product variants

TYPe
Dimension
Drawing documentation
TWZN H4" 16"/16"
-
TWZN H4" 16"/16"
-
Bez manžety

Product variants

TYPe
Dimension
Drawing documentation
TWZN H4" 16"/16"
-
TWZN H4" 16"/16"
-

FLOWRATES

Flowrate of the drain in GPM (gallon per minute)
Water head (in)
Name
Type
(DN)
1
2
3
4
5
No items found.
Flowrate of the drain in GPM (gallon per minute)
Water head (in)
Name
Type
(DN)
1
2
3
4
5
6
No items found.

Related products

No items found.